Electrical Services in
Toronto and the GTA
Electrical work is one area where the difference between a licensed professional and someone who is not properly certified can cost you significantly more in the long run, sometimes in insurance problems, sometimes in failed inspections, and in the worst cases, in safety incidents that could have been avoided entirely.
My Property Care works with licensed electricians across Toronto and the GTA. Every project is completed by a Licensed Electrical Contractor, ESA-permitted, and inspected before the job is closed out. Whether you need a straightforward outlet installation, a full panel upgrade to support an EV charger, or an assessment of older wiring in a heritage Toronto home, we handle the scope properly from start to finish.
Call 289-301-0925 to book or get a free electrical quote across Toronto and the GTA.
Submit your details below
Electrical Services We Provide
Electrical Panel Upgrade
This is one of the most requested electrical services in the GTA right now, and for good reason. A large number of Toronto homes were built with 100-amp electrical panels. That capacity was adequate for 1970s or 1980s appliance loads, but it falls short for today’s combination of electric ranges, clothes dryers, air conditioners, and especially EV chargers and heat pumps.
A 100-amp to 200-amp panel upgrade in Ontario typically costs $2,000 to $4,500 installed, including the new panel, labour, ESA permit coordination, and the ESA Certificate of Acceptance. If the utility service entrance cable or meter base also needs upgrading, add $300 to $900 for that work plus a Toronto Hydro service coordination fee of approximately $120.
Signs your home may need a panel upgrade:
- Breakers trip repeatedly under normal household loads
- You cannot add a new 240V circuit for a dryer, EV charger, or range without overloading the panel
- Your panel is a Federal Pacific Stab-Lok model, which was common in GTA homes built between the 1960s and 1980s and has a documented history of breaker failures
- Your home has fuses instead of breakers
- You are planning a major renovation or adding an accessory dwelling unit
A 200A panel upgrade typically takes one day for the electrical work. Toronto Hydro coordination for the utility service adds 2 to 6 weeks of scheduling lead time, so planning ahead matters.
EV Charger Installation Toronto
This is the fastest-growing electrical service request we see in the GTA. As EV adoption continues to grow across the Toronto area, more homeowners are realizing that the Level 1 charging cable that came with the car (which adds roughly 3 to 5 kilometres of range per hour from a standard 120V outlet) is not practical for daily use.
A Level 2 EV charger operates on 240V and adds 30 to 60 kilometres of range per hour, making overnight charging realistic and convenient. It is the standard for any homeowner who drives an EV as their primary vehicle.
EV charger installation costs in Toronto (2026):
- Level 2 charger installation with existing 200A panel: $1,500 to $4,000 installed
- Full bundle with 200A panel upgrade included: $5,500 to $9,500 installed
Every EV charger installation in Ontario requires an ESA permit and inspection. Work must be done by a Licensed Electrical Contractor with a Master Electrician designation. We handle the permit, the installation, and the ESA inspection from one call.
A note on Toronto Hydro’s EV rate: Toronto Hydro offers an ultra-low overnight electricity rate of approximately 2.4 cents per kilowatt-hour between 11pm and 7am for enrolled customers. This is a meaningful cost advantage for EV owners who charge overnight at home compared to public charging stations.
For condos and townhomes, Ontario’s Bill 135 (the EV Right to Charge legislation) requires condo boards to reasonably consider EV charger installation requests from residents. Building-specific installation involves a load study and sub-metering but is now a right, not purely a privilege subject to the board’s preference.
Knob and Tube Wiring Assessment and Replacement
If your Toronto home was built before 1950, there is a real chance it still has some knob-and-tube wiring. This is a cloth-and-rubber-insulated system that was standard in homes across the city from roughly 1900 to the 1940s. The wiring system itself was code-compliant when it was installed. The problems arise from age, previous amateur modifications, and the fact that it was not designed for modern electrical loads.
Toronto neighbourhoods with the highest rates of remaining knob-and-tube wiring include The Annex, Cabbagetown, Riverdale, Trinity-Bellwoods, Roncesvalles, High Park, Leslieville, and The Junction. If your home is in any of these areas and has not been rewired, an electrical assessment is worth scheduling.
Why knob-and-tube wiring matters for Toronto homeowners:
The insulation degrades over decades, leaving conductors exposed in walls and ceilings. There is no ground wire in the system, which creates shock risk with modern three-prong appliances. Circuits are typically rated at 15 amps, which is not adequate for modern kitchen, laundry, or HVAC loads. The most common fire scenario involving knob-and-tube wiring is when blown-in attic insulation has been packed around the wires, trapping heat from even normal loads.
Insurance implications. Approximately 40% of Ontario insurers will not write coverage on a home with active knob-and-tube wiring. Many others add a 15 to 30% surcharge, or require a licensed electrician’s approval confirming the system is safe. At home resale, an inspector will flag active knob-and-tube wiring as a material defect, which can affect your sale price or require remediation before closing.
Replacement costs in the GTA:
- Electrical assessment: $200 to $400
- Partial rewiring (targeted areas): $3,000 to $8,000
- Full rewiring of a small home: $8,000 to $12,000
- Full rewiring of a medium home: $10,000 to $18,000
- Full rewiring of a large or complex home: $20,000 to $30,000+
The ESA permit and inspection for a full rewire adds approximately $200 to $500. Drywall patching and plastering for access holes typically adds another $500 to $2,000.
One timing note: if you are already planning a renovation that opens walls, that is the right time to rewire. The labour to open and patch walls is already in your renovation budget, so the incremental cost of running new wire through open walls is significantly lower.
Pot Light Installation
Pot lights (recessed LED downlights) are one of the most popular electrical upgrades in GTA homes, and for good reason. They produce clean, even light distribution, they eliminate the visual clutter of hanging fixtures in living rooms and kitchens, and LED pot lights use a fraction of the electricity of older incandescent fixture types.
Pot light installation in Toronto typically costs $150 to $300 per light, with the total for a living room or kitchen project of 10 to 20 lights usually running $1,500 to $5,000 or more depending on the ceiling type and whether new circuits are needed.

Outlet and Circuit Installation
Additional outlets, dedicated circuits for new appliances, outdoor GFCI outlets, USB outlet replacements, and arc-fault circuit interrupter (AFCI) upgrades on bedroom circuits all require a Licensed Electrical Contractor and an ESA permit in Ontario. We complete these jobs with the proper permits and inspection sign-off, so the work appears on the ESA record for the property.
New outlet installation typically costs $150 to $500 depending on location and whether a new circuit is required from the panel.
Lighting Installation and Upgrades
Interior and exterior lighting fixture replacement, ceiling fan installation, under-cabinet lighting, and outdoor security lighting all require licensed electrical work where new wiring or circuit connections are involved. Light fixture replacement that swaps one fixture for another at an existing outlet box is typically the most straightforward scope. New circuit runs for outdoor lighting or feature lighting add to the complexity and cost.
What Every Toronto Homeowner Should Know About Electrical Work in Ontario
In Ontario, the Electrical Safety Authority (ESA) administers the Ontario Electrical Safety Code and oversees all electrical permits and inspections. Any electrical work beyond replacing a device at an existing outlet box (such as swapping a switch or outlet) requires an ESA permit pulled by a Licensed Electrical Contractor.
This matters for a few practical reasons:
Insurance coverage. Unpermitted electrical work is a common reason insurers deny claims after electrical fires or incidents. If your home has electrical modifications that were done without ESA permits, your insurer may treat those circuits as outside your policy’s coverage.
Home resale. Real estate lawyers and home inspectors increasingly review ESA records for properties. Missing permits on panel upgrades, service work, or rewiring done without inspection can affect your sale or require remediation before closing.
Safety. The inspection process exists specifically to catch errors before they become problems inside walls. A Certificate of Inspection from the ESA at the end of a job is documentation that the work was done to code.
We pull all required ESA permits for every project, coordinate inspections at the right stages, and provide the Certificate of Acceptance to our clients at job completion.
When You Need an Electrical Upgrade Before You Know It
There are a few scenarios in GTA homes where an electrical upgrade is not optional — it is the prerequisite for what you are planning to do.
Adding an EV charger. A Level 2 EV charger requires a dedicated 40 to 50 amp, 240V circuit. If your panel does not have that capacity available, the panel needs to be upgraded before the charger can be installed. This is now a common first step for GTA homeowners purchasing their first EV.
Installing a heat pump or electric furnace. Heat pumps and electric furnaces have significant electrical demand. Many GTA homes with 100-amp panels cannot support one without an upgrade.
Adding an accessory dwelling unit (ADU). Ontario’s planning changes have made it easier to add a basement apartment or garden suite. A second dwelling unit typically requires a panel upgrade and potentially a subpanel in the new unit.
Finishing a basement. A finished basement adds circuits for lighting, outlets, and potentially a bathroom. Older homes rarely have spare capacity in a 100-amp panel for this.

How This Connects to Your Home’s Other Systems
Electrical work rarely happens in isolation. If you are upgrading your panel to support an EV charger, that is also the right moment to assess whether your heating and cooling systems are ready for electrification. Many Toronto homeowners are pairing a panel upgrade with a heat pump installation as part of a broader move away from natural gas.
If you are considering a gas fireplace installation or other gas appliance, the electrical requirements for ignition, remote controls, and ventilation fans also need to be part of the conversation.
Our Service Area
We provide electrical services across Toronto, Mississauga, Brampton, Vaughan, Richmond Hill, Markham, Scarborough, North York, Etobicoke, and surrounding GTA communities.
- Toronto
- Mississauga
- Brampton
- Vaughan
- Richmond Hill
- Markham
- Scarborough
- North York
- Etobicoke
- Surrounding GTA Communities
Frequently Asked Questions
Licensed electricians in Toronto charge $80 to $150 per hour for journeyperson work and $110 to $160 or more per hour for master electrician rates. Most companies also charge a service or trip fee of $75 to $200 for the initial visit. Emergency electrical calls run $150 to $300 per hour with a two to three hour minimum. For specific projects: a new outlet runs $150 to $500, a pot light costs $150 to $300 each, a 200-amp panel upgrade runs $2,000 to $4,500 installed, and an EV charger installation with an existing adequate panel runs $1,500 to $4,000.
Yes, for most work beyond basic device swaps. Any new circuit, panel upgrade, service change, EV charger installation, rewiring, or addition of outlets in a new location requires an ESA permit and inspection in Ontario. The permit must be pulled by a Licensed Electrical Contractor. Work done without an ESA permit is not covered by most home insurance policies and can complicate home sales.
The clearest way is a visual inspection of your basement and attic, where knob-and-tube wiring is most visible. The wires run separately (live and neutral on separate ceramic knobs) rather than bundled in a cable sheath. The insulation is typically black rubber or cloth-wrapped. If you are in a Toronto neighbourhood built before 1950 (The Annex, Cabbagetown, Leslieville, Riverdale, Roncesvalles, High Park, and similar areas), an electrical assessment is a reasonable starting point. Book one with us at 289-301-0925.
Under Ontario’s Bill 135, condo corporations are required to reasonably consider EV charger installation requests from residents. The installation typically involves a building load study, ESA permit, sub-metering for the individual unit, and potentially a condo board agreement update. It is more involved than a detached home installation but it is now a right, not something the board can simply refuse without cause.
Federal Pacific Stab-Lok panels were installed in a large number of GTA homes built between the 1960s and 1980s. These panels have a documented history of breaker failures, where the breaker does not trip when it should under an overload or short circuit condition. This creates a fire risk. Many Ontario insurers either refuse coverage or require an upgraded panel as a condition of coverage for homes with these panels. If you are unsure whether your home has one, your electrician can confirm during a site visit.
The electrical work itself typically takes one day. Toronto Hydro coordination for the utility service disconnect and reconnect adds 2 to 6 weeks of scheduling lead time. The ESA inspection is typically scheduled 1 to 2 weeks after the work is complete. Plan for 4 to 8 weeks from initial booking to final Certificate of Acceptance if you are starting from scratch with no prior utility coordination.
The federal Greener Homes Loan offers up to $40,000 interest-free over 10 years for eligible home energy improvements, which can include an electrical panel upgrade when it is part of a broader retrofit that includes an EV charger or heat pump. There is currently no direct provincial rebate specifically for electrical panel upgrades. Toronto Hydro does offer a significantly reduced overnight electricity rate for EV charging (approximately 2.4 cents per kilowatt-hour between 11pm and 7am), which reduces the ongoing cost of home EV charging substantially.
Get a quote for electrical work in Toronto or the GTA
We handle permits, ESA coordination, and Toronto Hydro service work from start to finish. No unpermitted shortcuts.
Or get started at mypropertycare.ca/contact